September, 2012

View from the store window to production.

Town Hall Place

September, 2012

From Cool As A Moose looking at a window that looks down on production to where shirts are bring printed.

Town Hall Place

September, 2012

One row of printing and drying equipment is up and running.  The second row is scheduled for delivery next month.

Town Hall Place

September, 2012

The office area has been occupied.  Lighting has not been installed yet so the electricians will have to work around furniture.

Town Hall Place

September, 2012

Basement storage, still unpacking.

Town Hall Place

September, 2012

Artforms is in the house!

Town Hall Place

September, 2012

The first printing machine has been installed.  The dryer is in the background.  The second set of printing machines will be relocated to Brunswick after this first set is in production.

Town Hall Place

September, 2012

On the other half of the basement, beside production, is storage.

Town Hall Place

September, 2012

Production equipment is being moved in and assembled.

Town Hall Place

September, 2012

Office furniture being unpackaged and assembled.

Town Hall Place

September, 2012

Cabinets and appliances installed in the employee break room.

Town Hall Place

September, 2012

Ductwork for the production dryers in the basement.  Equipment is scheduled to be delivered the second week of September.

Town Hall Place

September, 2012

View from the art department to the offices below.

Town Hall Place

September, 2012

View from the second floor conference room towards the office below.

Town Hall Place

September, 2012

View of Artforms offices looking towards the first floor office/conference room.

Town Hall Place

September, 2012

Finishing touches in the offices of Artforms.

Town Hall Place

August, 2012

The cable railings create wonderful shadows on the balcony wall.

Town Hall Place

August, 2012

The existing joists that remain have been painted and the lighting is almost completed in the production area.

Town Hall Place

August, 2012

Artforms has been mocking up the location of the printing equipment on the basement floor.

Town Hall Place

August, 2012

The view from Cool As A Moose retail, looking out to the production floor to see where and how your clothes are printed.

Town Hall Place

August, 2012

The production floor, lighting being installed.

Town Hall Place

August, 2012

The cables have been installed.

Town Hall Place

August, 2012

View from the balcony with new cables installed.

Town Hall Place

August, 2012

Production to the left and storage to the right in the basement.  Straight ahead are the existing stairs from the old Grand City department store.

Town Hall Place

August, 2012

The office area has been sheetrocked.

Town Hall Place

June, 2012

The railing along the production area balcony has been installed. Cables will be installed later.

thp 146

May, 2012

Kip Stone and Caroline Kurrus at the Brunswick Downtown Association breakfast in May, 2012.

thp 148

May, 2012

Kip accepting an historic preservation award for the Town Hall Place / Cool As A Moose renovations.

thp 149

May, 2012

The award.

thp 150

May, 2012

These windows in the retail store allow customers to watch their clothing being printed for sale upstairs.

thp 147

May, 2012

Basement production area, ductwork being installed.

thp 145

May, 2012

Loading dock from the basement.

thp 144

May, 2012

Basement storage area.

thp 143

May, 2012

Corner office windows of the Production Manager’s office in the basement.

thp 142

April, 2012

Production walls and ceiling have been painted.

thp 141

April, 2012

Borrowed lite frames between the office and production area on the first floor.

thp 140

April, 2012

Hanging gypsum board on the first floor ceiling. The second floor office needs a rated separation between the office and production area.

thp 139

March, 2012

Office area with new windows, floor removed, and ductwork installed.

thp 138

March, 2012

One of the few items to remain in this multi-phased renovation, the original store stairs of Grand City.

thp 137

March, 2012

Ductwork lined up in the basement waiting to be installed.

thp 136

March, 2012

Elevator wall framed out.

thp 135

March, 2012

Kip Stone reviewing drawings.

thp 134

March, 2012

The production area in the basement has a much better feel now that the floor has been opened up.

thp 133

March, 2012

View from the employee break room, looking down onto production and to the windows in the Cool As A Moose retail store.

thp 132

March, 2012

The plywood has been removed! View from the production area to the new skylights.

thp 131

March, 2012

Another view of the second floor opening with the ductwork installed, to be a double height space in the office.

thp 130

March, 2012

Making great progress hanging gypsum board. The plywood is covering the large floor opening.

thp 129

November, 2011

View from the future conference room and art department overlooking the offices below.

thp 128

November, 2011

Ductwork being installed in the office area.

thp 127

November, 2011

All of the elevator equipment has been delivered to the site.

thp 126

November, 2011

The elevator shaft has been constructed.

thp 125

November, 2011

Town Hall Place in the early morning light.

thp 124

November, 2011

DMA came back out in November to check on phase 2. A little slow, things are happening again.

thp 123

May, 2011

A little sun has come out and the leaves are happy. Grand opening is scheduled for the Saturday of Memorial Day weekend.

thp 122

May, 2011

Curbing is being installed. The asphalt will be poured later this week and then the pavers will be installed over the subbase next week.

thp 121

May, 2011

Granite curbing is being installed along the rear of the building. The new entrance has been isntalled, too.

thp 120

May, 2011

Life is good side of the store.

thp 119

May, 2011

After the ribbon cutting ceremony, the bronze plaque was unveiled by Mike Ouellet, general contractor, and David Matero.

thp 118

May, 2011

Missy, the store manager, about the cut the ribbon in front of Brunswick council and chamber members.

thp 116

May, 2011

Ribbon cutting ceremony.

thp 115

May, 2011

Open for business.

thp 114

May, 2011

The back exit has been completed, except for the cleaning.

thp 113

May, 2011

Town Hall Place at night.

thp 117

May, 2011

Herbie greeting visitors from the exterior.

thp 112

May, 2011

Store opening is one full day away.

thp 111

May, 2011

The merchandise is beginning to be highlighted.

thp 110

May, 2011

Greg Day taking a break from aiming lights.

thp 109

May, 2011

Greg Day aiming lights. Lights are a combination of halogen (for color rendition) and LED (efficiency) track mounted fixtures.

thp 108

May, 2011

Toilet room is almost completed.

thp 107

May, 2011

The valance has been installed on the lights.

thp 106

May, 2011

Furiously unpacking, folding, tagging, and shelving.

thp 105

May, 2011

The Life is good sign is up.

thp 104a

May, 2011

Mike, the millworker, made a mockup of the light valance for the changing and toilet rooms.

thp 104

May, 2011

Installing lights in the new canopy.

thp 103

May, 2011

Mocking up the “Life is good” sign.

thp 102

May, 2011

The mechanical units have been delivered.

thp 101

May, 2011

The back stair has been opended up. Waiting for phase 2.

thp 100

May, 2011

Denis from Perfect Signs has delivered the bronze plaque commerorating the origingal Town Hall Building located on this site until it was torn down in 1961. The plaque will be unveiled during the ribbon cutting ceremony next week.

thp 099

May, 2011

The store and future office exit is beginning to be bricked.

thp 098a

May, 2011

Nicole Pilgrim painting Herbie the Moose.

thp 098

May, 2011

The metal deck has been removed in the office area. Diffused light will flood the offices.

 

thp 097

May, 2011

Looking through the borrowed lites from the retail to the future printing area.

thp 094

May, 2011

Lights mounted to the storefront will highlight window displays.

thp 093

May, 2011

The interior fit out of retail continues.

thp 092

April, 2011

The morning light reflecting the Town Hall Place letters. The perforated metal helps to create a dynamic sign with static elements.

thp 096

April, 2011

A combination of halogen and LED light fixtures are being installed throughout the retail area to achieve good color rendition and energy efficiency.

thp 092

April, 2011

Shelving being installed in Cool As A Moose.

thp 091

April, 2011

Cabinetry is being installed in the Life is good area. The windows (borrowed lites) from the store look out to the screen printing area in the basement.

thp 090

April, 2011

View from below.

thp 089

April, 2011

The precast concrete sills have been installed along the Maine Street windows, along with the sunshades.

thp 088

April, 2011

Notice the quality of light from the skylights. The plywood is on the floor for staging but when this is removed the light will make it down to the basement.

thp 087

April, 2011

The skylights being installed. These will bring daylight to the printing area in the basement.

thp 086

April, 2011

The interior of Cool As A Moose with paint and flooring going down.

thp 085

April, 2011

The Town Hall Place sign with lights.

thp 084

April, 2011

The interior of Cool As A Moose is being primed.

thp 083

April, 2011

The canopy frame is here. It is scheduled for installation soon.

thp 082

April, 2011

The skylights are being installed above the future printing area. Part of the floor is covered by plywood to act as staging but eventually that and every other joist will be removed to bring light into the basement. The windows into the retail area will allow shoppers to watch their shirts being printed.

thp 081

April, 2011

The upper part of the staging is down unveiling half the building.

thp 080

April, 2011

Sheetrock has been installed.

thp 079

April, 2011

The sign behind the curtain.

thp 078

April, 2011

John Lotfey (electrician) Jacques Santucci (Opus Consulting), and Karen Bushey (Cool As A Moose)

thp 077

April, 2011

This UFO is acutally roof decking being removed for the skylights.

thp 076

April, 2011

The architect and Jada looking at the finishes. Tracy Davis from Urban Dwellings (see photos below) chose a very nice pallette of colors.

thp 075

April, 2011

The existing roof membrane is being cut away for the installation of the skylight curb.

thp 074

April, 2011

The roofers are replacing insulation with new insulation and a fully adhered EPDM roofing.

thp 073

April, 2011

Denis from Perfect Signs holding one of the letters from Cool As A Moose.

thp 072

April, 2011

A job meeting with Ouellet Associates and the owner, Kip Stone, in red.

thp 071

April, 2011

The perimeter walls of the retail area have been sprayed insulated. This picture is also a good example of how the windows work, good light distribution and no glare.

thp 070

March, 2011

The skylight frames have been construced on the second floor. Once the roofers are ready, these will be carried out onto the roof. The glazing in the skylights are by Kalwall.

thp 069

March, 2011

The retail framing is complete and the rough-in is well on its way.

thp 068

March, 2011

Wall framing is set off the block so that spray insulation will create a thermal break between the block and metal studs. Note the Solera glazing on the upper windows.

thp 067

March, 2011

Washing the brick of the debris from cutting in the windows. Once the precast concrete sills are installed, the windows will be sealed tight.

thp 066

March, 2011

The aluminum sunshades are constructed as part of the Kawneer storefront system.

thp 065

March, 2011

Windows along the south wall are being installed. The aluminium sunshades will help block direct light during the summer but allow solar heat gain during the winter. Above the sunshades, Solera glazing will diffuse and distribute daylight to the interior.

thp 064

March, 2011

The first of the aluminum sunshades have been installed. This is the view from the interior.

thp 063

March, 2011

More welding for additonal roof reinforcing. The roof needed to be upgraded to current code standards.

thp 062

March, 2011

The storefront windows along Maine Street have been installed. The vision glass is in, but we are waiting for the Solera glass that will be installed in the upper panels. Solera glass will help diffuse and distribute light to the interior.

thp 061

March, 2011

The last of the floor grinding at newly poured concrete.

thp 060

March, 2011

The kickers have been installed. Waiting for the exterior canopy steel.

thp 059

March, 2011

A section detail by the structural engineers, Casco Bay Engineering, of the front canopy.

thp 058

March, 2011

The canopy beams will slide into these tabs.

thp 057

March, 2011

These tabs are being installed at the lcoation of the front canopy.

thp 056

March, 2011

Kickers will be slotted into the tabs welded to the beam at the roof. These kickers will angle down to connect to the canopy steel so assist with the cantilever loads of the canopy.

thp 055

March, 2011

The tabs for the canopy are being cut. This beam will be raised above and the kickers will be inserted into the tabs you see between the steel flanges (see kickers above).

thp 054

March, 2011

STEEL AND BAR JOISTS ARE HERE! Now we can start building.

thp 053

March, 2011

At the new entrance / exit being cut into the south wall, a copper pan was installed under the concrete and sloped to the exterior. Trying to alleviate the problem at the main entrance where water penetrated to the inside and rusted the structure.

thp 052

March, 2011

Pouring concrete near the front entrance, above the resupported (rusty) beam.

thp 051

March, 2011

Pouring concrete at the area of existing floor and metal deck that needed to be removed.

thp 050

February, 2011

Maybe a little hard to see, the window height along Maine Street will be almost 2′ higher than the original storefront windows. These large steel braces anchored wood blocking that supported a fabric awning frame. Removing the bottom of the braces and wood blocking will bring in more natural daylight through our Solera glass above the sunshade system.

thp 049

February, 2011

As you can see, rust has eaten a majority of the beam embedded in the foundation. A bent steel plate will be bolted through the foundation wall below and welded to the underside of this beam to provide new support.

thp 048

February, 2011

Eric Dube from Casco Bay Engineering and Don Ouellet from Ouellet Associates inspecting a severly rusted beam to determine whether to replace it or restructure itl.

thp 047

February, 2011

It was the right time to renovate the old Grand City building. Concrete was removed at the front entrance to expose rotting metal deck and a steel beam. Now is the time to take care of this.

thp 046

February, 2011

A mock up of the aluminum storefront window. To cover the edge of brick that has been cut, brake metal is wrapped around the edge. The storefront manufacturer has done a good job constructing this trim detail.

thp 045

Fefruary, 2011

Remember that brick wall in poor condition? It has been rebuilt behind the curtain.

thp 044

January, 2011

Staging and a protective structure for all the work that is beginning on the Maine Street facade.

thp 043

January, 2011

Detail of a window opening. Note the old way of installing brick ties. Every 6 courses bricks were laid on a header course and mortared into the concrete block. The disadvantage to this system is there is no air space beween the brick and block so the brick does not work as a rain screen. However, it has worked for over 50 years.

thp 042

January, 2011

Protective boxes have been installed in the openings, but they will be reused when the windows arrive. The wood frames will remain as nailing blocks for the frames. Insulation will be filled beween the wood and concrete.

thp 041

January, 2011

Many of the brick openings have been cut. The openings will have barriers until the windows arrive.

thp 040

December, 2010

Light! The first of the brick openings along the south side of the building have been cut. What a way to end the year. Here’s to a great start to 2011.

thp 039

December, 2010

The forms have been removed, water is still being pumped out below the pit. Once the waterproofing is installed and the hole is backfilled the water should not be an issue anymore.

thp 038

December, 2010

This is what happens when only the window remains in place at the front. All the metal and flashing has been removed above the window. Water and ice are doing their own design work to our rendering. Storefront shop drawings have been approved and the aluminmum windows and doors are being fabricated.

thp 037

December, 2010

The elevator pit has been poured. Now that Kip can see it, he is thinking of turning it into a Jacuzzi. One might think the elevator button for this floor ‘P’ stands for Production, we all know it means “Pool.”

thp 036

November, 2010

The elevator pit will be dug to 5′ below the slab. It has to be this wide to build the pit foundation walls.

thp 035

November, 2010

The hose goes down to the basement. This is a really big vacuum cleaner.

thp 034

November, 2010

The pump truck is pumping out dirt for the new elevator pit.

thp 033

November, 2010

The front gable has been removed as specified for the “Town Hall Place” sign. It’s likely we will have to remove this wall and rebuild it because of the quality of the brick veneer structure.

thp 032

November, 2010

The last of the cutting for the new lintels on the south facing brick wall. Once the lintels are in, the window openings can be cut out. The storefront windows and sunshade system have been approved and are on order.

thp 031

November, 2010

The second floor brick and block has been cut out for the installation of the lintels, and some are in. Also note the amount of concrete slab that has been removed. The metal decking remains as staging until the new windows are installed. Once the windows are in the metal deck will be removed to bring in light to the offices below.

thp 030

November, 2010

The front gable wood panels have been removed. The quality of the brick was a surprise. We expected clean brick veneer, even the clamshell paneling was formed into the brick out of wood. We will be meeting masons on site to determine the next course of action.

thp 029

November, 2010

South façade. Lintels are being installed from the interior so the wall does not need shoring or bracing.

thp 028

October, 2010

View of the future screen printing room. Eventually, every other bar joist will be removed.

thp 027

October, 2010

This is what happens when moisture is allowed to migrate inside. Just below the vestibule above, moisture and salt have combined to rust out the metal decking in this area. There are 3 or 4 places throughout the building where this has happened.

thp 026

October, 2010

The existing vestibule has been removed

thp 025

October, 2010

Sawcutting existing concrete slab in the basement to install plumbing lines for the new screen cleaning rooms and toilet rooms.

thp 024

October, 2010

To install plumbing under existing concrete slab, the slab and grade must be trenched. A sawcutting machine will cut the slab into manageable pieces.

thp 023

October, 2010

Perimeter framing, the metal studs are set off the wall so that foam insulation can be sprayed behind the studs creating a thermal break between concrete block and metal. The ceiling in this area must be covered to create a fire rating between the production area and the second floor.

thp 022

October, 2010

The old handicap lift is being removed piece by piece. You can just see Lance’s hard hat bottom left.

thp 021

October, 2010

Photo of a railing mock-up. The railing will be surrounding the new floor opening down to the screen printing area. The railing must be see-through so that visitors to the retail store can watch their garments being printed.

thp 020

October, 2010

Interior designer, Tracy Davis, Urban Dwellings, reviews finishes with Karen Bushey, Cool As A Moose, and Kip Stone (not in photo).

thp 019

October, 2010

Wall framing has begun.

thp 018

October, 2010

The new windows have been designed to fit within brick and block coursing so the work can be accomplished from the interior. The steel lintels will be installed before the concrete block and brick is removed.

thp 017

October, 2010

Owner’s Rep, Dale Akeley, Architect David Matero, Electrical Engineer, Will Bennett and Electrician, John Lotfey reviewing the plans.

thp 016

October, 2010

Shadows in the basement after removing existing flooring and allowing light in. One of the many images during demolition that you will not see again once construction begins.

thp 015

October, 2010

Owner, Kip Stone, and the electrician looking on as Greg Day, DayMatero studio, reviews the lighting design

thp 014

September, 2010

Location of new openings in the exterior wall painted on the concrete block.

thp 013

September, 2010

Concrete has been removed from this portion of the second floor.  Metal deck remains because new windows will be cut out of the brick and concrete block wall and the contractor can still use the floor for staging.

thp 012

September, 2010

All concrete and metal decking has been removed in this location.  Every other bar joist will eventually be removed.  Screenprinting will take place below, in the lower level. The removal of existing flooring will allow light nto this space.

thp 011

September, 2010

After the concrete slab is removed, the metal deck is welded off the bar joists.

thp 010

August, 2010

Of the 40,000 sf of existing concrete floor, about 5,000 sf will be removed for multi-level spaces and light.

thp 009

August, 2010

Serious demolition now.  These walls were the old employee toilet rooms on the second floor

thp 008

June, 2010

The interior walls are either concrete block or, in this case, metal lath and plaster

thp 007

June, 2010

The dumpster arrives for the beginning of the easy demolition

thp 003

May, 2010

Existing stairs will be salvaged and relocated

thp 006

May, 2010

The main stair from the first floor to the basement with an old handicap lift

thp 005

May, 2010

View of the front entrance at the old Grand City.

thp 004

May, 2010

Approved South Elevation with new storefront windows, diffused glazing, and sun shade system to allow natural, non-glare daylight into this 1960’s building

thp 002a

May, 2010

Brunswick Village Review Board approved the proposed design of Town Hall Place as presented by David Matero, DayMatero studio, for the new home of Artforms and Cool As A Moose.  Notice the removal of the gable, new canopy, new storefront and window shade system

thp 001a

April, 2010

Town Hall Place road towards the Brunswick Fire Station.  This brick wall faces south.  Picture this façade with new windows.

thp 002

April, 2010

The old Grand City department store on Maine Street in Brunswick, Maine.  The 40,000 sf store and restaurant in the heart of downtown Brunswick went on the market in 2009 and was purchased in early 2010 by Kip Stone, owner of Cool as a Moose and Artforms

thp 001


Social