100 Front Street, Suite 40
Bath, Maine 04530
david@davidmatero.com
207.389.4278

Nashoba Learning Group, Bedford, Massachusetts

Nashoba Learning Group – School for Children with Autism

Architecture – Phase 1: David Matero with Stephen Blatt Architects

Architecture – Phase 2: David Matero with DayMatero studio

Lighting Design: Greg Day Lighting

Builder – Phase 1: A/Z Corporation

Builder – Phase 2: Gutierrez Co.

Nashoba Learning Group outgrew their current building and purchased an existing two-story, 40,000 sf brick building in an office park.

The building was fully renovated from an technology/office space into a hands-on school for up to 70 students ages 3 to 22.  One-on-one instruction and a vocational curriculum is used to educate this autistic population.

Much research on the behavioral and environmental requirements for these students was put into the design of this renovation, and includes classrooms, offices, gymnasium, kitchen, vocational hotel room and laundry room.

David Matero was project manager while with Stephen Blatt Architects during the phase 1, 35,000 sf renovation project.  Nashoba Learning Group asked David Matero to manage the phase 2, 5,000 sf renovation while with Nashoba Learning Group

 

Social
© 2017 David Matero Architecture linkedin Houzz facebook Leed